Announcements
Showing 1-3 of 3 items.
| # | ID | Announcement | Date Added | Added By | Active | |
|---|---|---|---|---|---|---|
| 1 | 1 | DELIVERY DELAYS – BRIDGE RESTRICTIONS (AFFECTED AREAS) Please be advised that delivery delays may occur due to bridge load limits affecting the following areas: • Liloan, Southern Leyte – Liloan Bridge (3 tons including 1.5-ton truck) • Calbiga, Samar – Calbiga Bridge (30 tons) • Leyte–Samar Route – San Juanico Bridge (30 tons) • Biliran Province – Biliran Bridge (4 tons) • Northern Samar (Palanit Area) – Palanit Bridge (15 tons) These restrictions require rerouting and load adjustments, which may impact delivery schedules in the above areas. Thank you for your understanding. All dispatch and delivery teams are instructed to strictly follow these load limits to avoid delays, penalties, or safety issues. Thank you. | 2026-07-01 02:32:26 | (not set) | Y | |
| 2 | 2 | PORT OPERATIONS ADVISORY – NORTHPORT Please be advised that due to inclement weather conditions, Northport terminal operations are currently under stop-and-go status as of 1300H today. This affects all activities including: • Gate operations • Yard operations • Vessel operations Movement will depend on the prevailing wind and weather conditions. We prioritize the safety and security of all personnel, cargo, and port users. Operations may resume or pause without prior notice depending on conditions. • Expect possible delays in container release and deliveries | 2026-08-10 20:40:11 | (not set) | Y | |
| 3 | 3 | DELIVERY ADVISORY Please be advised that due to bad weather conditions, landslides, and flooding, deliveries may be delayed or temporarily suspended in the following areas: Affected Locations: • Pampanga • Baguio City • Benguet • Pangasinan (some areas) • Nueva Ecija (some areas) • Tarlac (some areas) • Ilocos Sur • Ilocos Norte • Abra • Mountain Province • Kalinga • Ifugao • Isabela (some areas) • Cagayan (some areas) • Apayao • Aurora Advisory: • Expect delivery delays and possible rescheduling • Road access may be limited due to landslides and flooding • Our team will resume normal operations once conditions are safe | 2026-08-10 20:45:26 | (not set) | Y |